Building the Base
When our team arrived to the job site the existing pool had already been taken down and removed from the property. They got right to work leveling the area and building the base track of the pool.

The Pool Wall
The team laid sand at the bottom of the pool and installed the pool wall. Sand cushions the floor of the pool and acts as an added barrier between the liner and anything that could protentially puncture it.

Liner, Caps and Ledges
The team installed the liner for the pool, followed by all caps and ledges. They took great care to slowly fill the pool with water to ensure there were no creases or wrinkles in the liner.

Skimmer and Filter Installation
The team installed the skimmer and filtration system for this replacement above ground swimming pool. This client is ready for years more fun in the summer sun thanks to the teams at Y.E.S.