Solid Foundation
After the excavation had been completed, our teams got right to work installing this 12' round above ground swimming pool. They built the base track for the pool, taking great care to ensure a sturdy foundation.
Build That Wall
The team installed the pool wall and spread sand at the bottom of the pool. Sand is crucial to any above ground swimming pool installation as it provides cushion to the pool and protects the liner from anything that could potentially puncture or tear the liner.
Living For Liner
The team installed the liner for the pool and began slowly filling the pool with water. It is necesary to fill the pool slowly to ensure the liner has time to properly stretch and conform to the pool without causing any creases or wrinkles in the newly installed liner.
Filter That Pool
The next step was to install the swimming pool's filtration system which our expert team completed seemlessly. They tested the system for any leaks and primed the pump, then installed the bonding wire for the pool.
In The Trenches
Bonding your pool is crucial to ensuring it is safe and swimmable. To do this, the team dug deep trenches around the pool, and from the filtration system to the electrical panel.
The Final Step
The final step in this installation was to back-fill the trenches. Once back-filled, the area around this pool was seemless and ready for swimming! The homeowner was so pleased with the work our team did, and even more excited to go for a dip in his brand new pool.