Excavation Station And A Strong Foundation
The client wanted his pool intentionally sunk 33' inches into the ground. This was no problem for our teams! After the site was fully excavated our team began building the base track for the swimming pool.
Beginning the Build
After building the base track, the team installed the pool wall and laid sand at the bottom of the pool. Sand acts a added cushion and also protects the liner against anything that may puncture or tear it.
Luscious Liner
The team installed the liner and slowly filled the pool with water to ensure no creases or wrinkles formed. Then, they installed the caps and ledges for the pool.
Filtration Nation
Once the pool had filled with water our amazing team installed the filtration system. They primed the pump and made sure everything was working properly before moving on to the electrical work.
Bond Baby Bond
The team back-filled the area around the pool and laid the bonding wire. Bonding a swimming pool is crucial to ensuring it is safe and swimmable!
Pool Project Perfection
When the bonding was completed the crew finished back-filling and this pool project was complete!