Breaking Ground
This pool replacement began with our team excavating and expanding the site. After achieving a perfectly level surface, the team built the base track for the pool ensuring a sturdy and secure pool structure.
Sandy Squish
The team laid a layer of sand at the bottom of the pool to act as a barrier between the ground and the pool's liner, while also providing cushion to the bottom of the pool.
Liner Perfection
They installed the swimming pool's liner taking great care to ensure the liner was perfectly positioned before slowly adding water. Its crucial to add water slowly so the liner has time to stretch and conform to the shape of the pool while also making sure there are no creases or wrinkles forming.
Bonding Bonding Baby
After installing the liner, it was time for our team to complete the electrical work and trench and bonding of the pool. This homeowner hired us to upgrade their existing electrical post and once that was complete they laid the bonding wire. Bonding a swimming pool is crucial to ensuring a safe swimming space!
Pool Perfection
The team back-filled their trenches and this pool project was complete! The homeowner was absolutely thrilled at the work from our amazings teams, and couldn't wait to make a splash in his brand new above ground pool!