What A Mess
The client hired our team for the installation only and claimed the responsibility of taking down and removing the existing pool himself. He removed the concrete footings for the existing pool and dug the site 52' below the deck.
Level the Base
The team arrived on site and immediately got to work installing the replacement swimming pool! They leveled the ground where the pool would rest and built the base track for the new pool.
Pool Wall
The team installed the pool wall and added sand to the bottom of the swimming pool to add cushion and protect against anything that could potentially punture the pool liner.
Liner, Cap & Ledges
The team installed the pools liner, as well as all the caps and ledges for the pool. Then they began slowly filling the pool with water to prevent causing any creases or wrinkles in the liner.
Filtration System
After intalling the filtration system this swimming pool replacement was complete! Another great job by our teams.