Fresh Start
When our team arrived to the jobsite the existing swimming pool had akready been taken down and removed from the property. Our team was able to diver right in to their work.
Smooth Surfaces
The team had to expand the site by hand before they could level the ground to ensure a smooth surface for the new swimming pool. They built the base track for the pool and began working on installing the pool wall.
Sandy Bottom
After erecting the pool wall, our team spread sand around the bottom of the pool. Sand acts as a barrier between the ground and the liner for the swimming pool. It protects the liner from anything that may puncture or tear it.
Liner Blues
They installed the swimming pools liner as well as all the caps and ledges for the pool, then began to fill the pool with water slowly to ensure no cracks or creases formed in the liner.
Another Job Well Done
The team installed the skimmer for the swimming pool and connected all the existing filtration equipment. Then they tested the equipment to ensure everything was running perfectly. This swimming pool replacement was complete thanks to our amazing teams!