Breaking Ground
After completing the estimate and obtaining all the necessary permits, our team was ready to begin the installation of this 12x24 oval above ground swimming pool. They excavated the area under the pool to ensure it was level before building the base track for the pool.
Level Up
Then they installed the pool wall and added sand to the bottom of the pool. Sand acts as a barrier between the ground and the swimming pools liner. It helps protect against anything under the pool that could puncture or cause damage to the liner, and also helps keep the pool level.
Liner, Caps, and Ledges
Next they installed the pool liner, as well as all the caps and ledges for the pool. The ledges of your swimming pool not only keep the pool looking polished and fresh they also help keep the pool liner in place!
Come Bond With Us
The team dug trenches around the pool and laid the bonding wire. Bonding a pool creates safe pathways for the electrical current to run between the pool and its metallic equipment. It is a crucial step to ensure proper function of the pool, and to avoid causing shock or electrical damage to any people or pets near the pool.
A Job Well Down
The team back-filled their trenches and completed the electric termination. This swimming pool project is complete and the client cannot wait to dip his toes in the water and relax under the summer sun.