Installing the Base Track
When our team got to the site the existing pool had already been taken down and removed from the property. They got right to work leveling the ground and installing the base track for the replacement pool.
Sand
They laid sand to cushion the bottom of the pool, and act as a barrier between the ground and the pool's liner.
Pool Wall
The team leveled the sand and installed the pool wall in no time. This pool is almost ready for use!
Project Complete
They installed the liner as well as the caps and ledges for the pool, then slowly filled the pool with water. This client chose a deep blue liner which looks absolutely stunning!