Liner Installed
They installed a dark blue liner, added all the caps and ledges to the pool and began slowly filling the pool with water.
Bonding the Pool
At their next visit the crew completed the electrical work as well as the electrical bonding. It is important to properly bond your pool in order to ensure it is safe and swimmable.
Project Complete
Once they were finished they back-filled the trenches, and the job was complete. Nicole can't wait to soak up the sun in her new swimming pool!
Building the Base Track
After the ground had been excavated and leveled, the crew got started installing the pool. They began with the base track and then built the pool wall.
Before the Work
Nicole signed up for our White Glove Permit Service so it was up to us to complete the permit process. Once the necessary documents had been obtained, the crew was able to complete the first step in the installation process, excavation.