Installed the Base Track
After excavating and leveling the ground our team set up the base track for the pool. They laid blocks to ensure the track stayed level and installed the supports for the pool wall.
Installing the Pool Wall
Once the base track was installed the crew got to work installing the pool wall. They laid sand on the bottom of the pool to cushion, and act as a barrier between the ground and the pool liner.
Liner & Ledges
The crew installed the liner as well as all the caps and ledges. They then slowly filled the pool with water to ensure no creases or wrinkles were left in the liner.
Trench & Bond
Once the pool was fully installed it was time to work on the pool's electric, as well as electrical bonding. The bonding of your pool ensures it is safe and swimmable. This project was complete, and the client was so excited to use her new pool for years to come!