Leveling the Area
When our crew arrived at the property the previous pool had already been removed. They were able to get right to work hand-leveling the area where the replacement pool would rest. The client wanted to increase the pool's deep end from 1' to 2' so our crew had to account for that during the excavation process.
Installing the Pool Wall
They laid the base track for the pool, and installed the pool wall, as well as the caps and ledges. The crew then coated the inside of the pool with sand to act as a barrier between the ground and the pool's liner.
Installing the Liner
They installed the liner and started slowly filling the pool with water. This gave the liner a chance to stretch and conform to the pool without causing wrinkles or creases. After that they installed the piping and electrical bonding.
Project Complete
Last but not least, our team back-filled the area around the pool and finished the look off with our signature landscape package. Another YES job well done!