Solution
We sent our estimators, Bill & Allan, to the property to determine the location of the pool and cost of the project. There was no BobCat access to this yard, so our crew had to hand-dig the site to ensure the pool was on level ground. After completing the excavation it was time for our team to install the base track of the pool.
The crew laid sand as a protective barrier between the ground and the pool’s liner. They installed the pool wall and leveled the sand to avoid causing dips in the bottom of the pool. The crew installed the pool’s liner, the caps and ledges, then began slowly filling the pool with water. It is crucial to fill the pool slowly after a liner change to avoid causing creases or wrinkles in the liner.
After the liner was installed, our team completed the electric and electrical bonding for the pool. Bonding your pool ensures it is safe and swimmable. It prevents the transmission of any harmful electrical voltage to the pool equipment or people using the pool. Once the bonding was completed our crew back-filled the trenches and finished the look with our signature landscape package!
The client was delighted, and finally had the backyard of her dreams.